{"id":1534,"date":"2023-04-04T11:52:03","date_gmt":"2023-04-04T11:52:03","guid":{"rendered":"https:\/\/cges.me\/nabavka\/poziv-za-nadmetanje-broj-17-10-04-16-04-2023\/"},"modified":"2023-04-04T11:52:03","modified_gmt":"2023-04-04T11:52:03","slug":"poziv-za-nadmetanje-broj-17-10-04-16-04-2023","status":"publish","type":"nabavka","link":"https:\/\/cges.me\/en\/nabavka\/poziv-za-nadmetanje-broj-17-10-04-16-04-2023\/","title":{"rendered":"Tender Notice No. 17 \u2013 10.04.2023 to 16.04.2023"},"content":{"rendered":"<p align=\"center\" style=\"text-align: justify;\"><span><span lang=\"EN-US\">Procurement of electricity to cover losses in the transmission system for periods 10<\/span><span lang=\"EN-US\">04-16 April 2023<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"\">&nbsp;<span lang=\"sr-Latn-BA\" style=\" color: black;\">Crnogorski elektroprenosni sistem AD Podgorica<\/span><span lang=\"SR-LATN-RS\" style=\" color: black;\">, publishes a call for the procurement of energy to cover losses in the transmission <\/span><span lang=\"SR-LATN-RS\" style=\" color: black;\">system for a period <\/span><\/span><span lang=\"SR-LATN-RS\" style=\" color: black;\">1<\/span><span lang=\"SR-LATN-RS\" style=\" color: black;\">0<\/span><span style=\"color: black; \"><span lang=\"EN-US\" style=\"color: #666666; \">04-16 April 2023<\/span><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"\"><span lang=\"SR-LATN-RS\" style=\" color: black;\">The auction in question will be held on 06.04.2023 between 09:00 and 11:00 (CET), via the Montenegrin Power Exchange (BELEN):<\/span>&nbsp;<a href=\"http:\/\/belen-spot.me\/\" target=\"_blank\" rel=\"noopener\">http:\/\/belen-spot.me\/<\/a>.<\/span><\/p>\n<p class=\"MsoNormal\"><span style=\"\"><\/span><\/p>\n<p><span style=\"\">&nbsp;<a href=\"\/en\/images\/fajlovi\/tender\/CGES_poziv_17-2023_10.04.-16.04.2023.pdf\/\">Link for downloading the invitation<\/a><\/span><\/p>\n<p><span style=\"\">&nbsp;<a href=\"\/en\/images\/CGES_ugovor_nacrt_poziv_17_za_period_10.04.-16.04.2023.pdf\/\">Link to the draft contract<\/a><\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"featured_media":1465,"template":"","meta":{"_acf_changed":false},"class_list":["post-1534","nabavka","type-nabavka","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Aktivan"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/nabavka\/1534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/nabavka"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/nabavka"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/1465"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=1534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}