{"id":1591,"date":"2017-10-02T06:59:32","date_gmt":"2017-10-02T06:59:32","guid":{"rendered":"https:\/\/cges.me\/nabavka\/poziv-za-javno-nadmetanje-u-otvorenom-postupku-javne-nabavke-32-17\/"},"modified":"2017-10-02T06:59:32","modified_gmt":"2017-10-02T06:59:32","slug":"poziv-za-javno-nadmetanje-u-otvorenom-postupku-javne-nabavke-32-17","status":"publish","type":"nabavka","link":"https:\/\/cges.me\/en\/nabavka\/poziv-za-javno-nadmetanje-u-otvorenom-postupku-javne-nabavke-32-17\/","title":{"rendered":"Invitation to Tender in the open procedure for public procurement 32\/17"},"content":{"rendered":"<p><strong><span lang=\"EN-US\" style=\" line-height: 115%;  color: #000000;\">Supply and replacement of phase conductors and part of the suspension and jointing equipment on the 110 kV Budva-Podgorica 2 double circuit <\/span><\/strong><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #a6a6a6;\">\n<h1 style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><a name=\"_Toc491427341\" style=\"color: #000000;\"><\/a><a name=\"_Toc413332214\" style=\"color: #000000;\"><\/a><span lang=\"EN-US\">Invitation<\/span><span lang=\"EN-US\"> For public competition in an open public procurement procedure<\/span><span lang=\"PL\" style=\"\"><o_p><\/o_p><\/span><\/span><\/h1>\n<\/div>\n<p class=\"MsoNormal\" align=\"center\" style=\"margin: 0cm 0cm 0.0001pt 18pt; text-align: center; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" align=\"center\" style=\"margin: 0cm 0cm 0.0001pt 18pt; text-align: center; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">Orderer's details<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" width=\"0\" style=\"width: 460.7pt; margin-left: -7.85pt; border: none;\">\n<tbody>\n<tr style=\"height: 30.6pt;\">\n<td width=\"312\" valign=\"top\" style=\"width: 233.9pt; border-width: 1.5pt 1pt 1pt 1.5pt; border-style: double solid solid double; border-color: windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Client:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">Montenegrin Electricity Transmission System AD<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<td width=\"302\" valign=\"top\" style=\"width: 8cm; border-top: 1.5pt double windowtext; border-left: none; border-bottom: 1pt solid windowtext; border-right: 1.5pt double windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Information point:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">Igor Radusinovi\u0107<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 30.6pt;\">\n<td width=\"312\" valign=\"top\" style=\"width: 233.9pt; border-top: none; border-left: 1.5pt double windowtext; border-bottom: 1pt solid windowtext; border-right: 1pt solid windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Address:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">18 St. Peter of Cetinje Boulevard<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<td width=\"302\" valign=\"top\" style=\"width: 8cm; border-top: none; border-left: none; border-bottom: 1pt solid windowtext; border-right: 1.5pt double windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Postcode:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">81000<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 30.6pt;\">\n<td width=\"312\" valign=\"top\" style=\"width: 233.9pt; border-top: none; border-left: 1.5pt double windowtext; border-bottom: 1pt solid windowtext; border-right: 1pt solid windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Headquarters:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Podgorica<o_p><\/o_p><\/span><\/p>\n<\/td>\n<td width=\"302\" valign=\"top\" style=\"width: 8cm; border-top: none; border-left: none; border-bottom: 1pt solid windowtext; border-right: 1.5pt double windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">GDP:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">02751372<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 30.6pt;\">\n<td width=\"312\" valign=\"top\" style=\"width: 233.9pt; border-top: none; border-left: 1.5pt double windowtext; border-bottom: 1pt solid windowtext; border-right: 1pt solid windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Telephone:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">+382 (20) 407 698<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<td width=\"302\" valign=\"top\" style=\"width: 8cm; border-top: none; border-left: none; border-bottom: 1pt solid windowtext; border-right: 1.5pt double windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Fax:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">+382 (20) 244-492<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<tr style=\"height: 30.6pt;\">\n<td width=\"312\" valign=\"top\" style=\"width: 233.9pt; border-top: none; border-left: 1.5pt double windowtext; border-bottom: 1.5pt double windowtext; border-right: 1pt solid windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">E-mail address:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\"><a href=\"mailto:igor.radusinovic@cges.me\" style=\"color: #000000;\"><span style=\" \">igor.radusinovic@cges.me<\/span><\/a><\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<td width=\"302\" valign=\"top\" style=\"width: 8cm; border-top: none; border-left: none; border-bottom: 1.5pt double windowtext; border-right: 1.5pt double windowtext; padding: 0cm 5.4pt; height: 30.6pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Website:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\"><a href=\"https:\/\/cges.me\/en\/\" style=\"color: #000000;\"><span style=\" \">www.cges.me<\/span><\/a><\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">II Type of procedure<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">\u2014 open procedure.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">III Subject of the public procurement<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 36pt; text-align: justify; text-indent: -18pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><b><span lang=\"sr\" style=\" \">a)<span style=\"font-variant-numeric: normal; font-weight: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><\/b><!--[endif]--><b><span lang=\"sr\" style=\" \">Type of public procurement item<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 35.45pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"DA\" style=\" \"> Dresses <o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 36pt; text-align: justify; text-indent: -18pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><b><span lang=\"sr\" style=\" \">b)<span style=\"font-variant-numeric: normal; font-weight: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><\/b><!--[endif]--><b><span lang=\"sr\" style=\" \">Description of the public procurement item<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left: -5.3pt; border: none;\">\n<tbody>\n<tr>\n<td width=\"612\" valign=\"top\" style=\"width: 458.95pt; border-width: 1pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-image: initial; padding: 0cm 5.4pt;\">\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 18pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">Supply and replacement of phase conductors and part of the suspension and jointing equipment on the 110 kV Budva-Podgorica 2 double circuit<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 36pt; text-align: justify; text-indent: -18pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><b><span lang=\"sr\" style=\" \">c)<span style=\"font-variant-numeric: normal; font-weight: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><\/b><!--[endif]--><b><span lang=\"sr\" style=\" \">CPV \u2013 Common Procurement Vocabulary<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left: -5.3pt; border: none;\">\n<tbody>\n<tr>\n<td width=\"612\" valign=\"top\" style=\"width: 458.95pt; border-width: 1pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-image: initial; padding: 0cm 5.4pt;\">\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 17.85pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">31682400-4 Above-ground electrical equipment<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 17.85pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">31321300-5 High-voltage cables<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 17.85pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">51110000-6 Installation of electrical equipment services<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">IV Conclusion of the framework agreement<\/span><\/b><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">A framework agreement will be concluded:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"DA\" style=\" \"> no<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">V Method of determining the object and <\/span><\/b><b><span lang=\"PL\" style=\" \">Estimated value of the public procurement<\/span><\/b><b><span lang=\"EN-US\" style=\" \">:<\/span><\/b><b><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><b><span lang=\"PL\" style=\" \">Estimated value of procurement without concluding a framework agreement<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The subject of the public procurement is being procured:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> as a whole,<\/span><span lang=\"PL\" style=\" \"> estimated value including VAT \u20ac606,900.00;<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">I can<\/span><\/b><b><span lang=\"HR\" style=\" \">\u0107<\/span><\/b><b><span lang=\"EN-US\" style=\" \">Submission of alternative bids<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"HR\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"PL\" style=\" \"> no<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><i><span lang=\"PL\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/i><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \">VII Conditions for participation in the public procurement procedure<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"SL\" style=\" \">a) Mandatory requirements<span style=\"text-decoration: underline;\"><o_p><\/o_p><\/span><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><i><span style=\"text-decoration: underline;\"><span lang=\"SL\" style=\" \"><o_p><span>&nbsp;<\/span><\/o_p><\/span><\/span><\/i><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Only a tenderer who:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-align: justify; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">1) is entered in the register with the authority competent for the registration of business entities;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-align: justify; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">2) has duly fulfilled all its tax and social security contributions obligations in accordance with the law, or the regulations of the state in which it is established;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-align: justify; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">3) prove that he or his legal representative has not been convicted by a final judgment for any of the criminal offences of organised crime involving corruption, money laundering and fraud;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-align: justify; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">4) has a permit, licence, approval or other authorisation to carry out the activity that is the subject of the public procurement, if this is required by a special law.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-align: justify; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The conditions of paragraph 1 of this point do not apply to natural persons: artists, scientists and cultural creators.<o_p><\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt 1pt 3pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"SL\" style=\" \">Proof of compliance with mandatory requirements<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"SL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"SL\" style=\"  color: #000000;\">Compliance with the mandatory requirements is demonstrated by providing:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"SL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 37.8pt; text-align: justify; text-indent: -15.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">1) proof of registration with the competent authority for the registration of business entities, with details of the bidder's authorised representatives;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 37.8pt; text-align: justify; text-indent: -15.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">2) a certificate issued by the tax authority confirming that all tax and contribution obligations have been duly declared, calculated and paid up to 90 days prior to the date of the public tender opening, in accordance with the regulations of Montenegro, or the regulations of the country in which the tenderer is headquartered;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 37.8pt; text-align: justify; text-indent: -15.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">3) a certificate from the competent authority issued on the basis of the criminal record, which must not be older than six months as of the date of the public opening of bids;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 37.8pt; text-align: justify; text-indent: -15.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">4) proof of possession of a valid permit, licence, approval, or other act issued by the competent authority, namely:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-align: justify; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left: -5.3pt; border: none;\">\n<tbody>\n<tr style=\"height: 35pt;\">\n<td width=\"619\" valign=\"top\" style=\"width: 464.35pt; border-width: 1pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-image: initial; padding: 0cm 5.4pt; height: 35pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">A company, a legal entity, or a sole trader must hold a licence for:&nbsp; <o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">carried out geodetic works,<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">\u2014 carrying out electrical installations for high current,<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">and<\/span><span lang=\"EN-US\" style=\" \">Construction of high-voltage electrical installation projects,<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">&nbsp;and employed engineers licensed for:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">management of the execution of surveying works<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">management of the installation of high-voltage electrical installations,<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">- <\/span><span lang=\"EN-US\" style=\" \">Preparation of projects for high-voltage electrical installations.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 34.5pt; text-indent: -12pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">b) Optional conditions<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span style=\"text-decoration: underline;\"><span lang=\"PL\" style=\" \"><o_p><span>&nbsp;<\/span><\/o_p><\/span><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">b1) <span style=\"text-decoration: underline;\">Financial capacity<\/span><\/span><\/b><span lang=\"SL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\" color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">Not required. <o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin: 0cm 0cm 0.0001pt 29.25pt; text-align: justify; text-indent: -6.75pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"SL\" style=\" \">b2) <span style=\"text-decoration: underline;\">Professional and technical competence and staffing capacity<\/span><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><i><span style=\"text-decoration: underline;\"><span lang=\"EN-US\" style=\" \"><o_p><span>&nbsp;<\/span><\/o_p><\/span><\/span><\/i><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">Fulfilling the conditions of professional, technical and personnel qualifications in the public procurement procedure <span style=\"text-decoration: underline;\">goods<\/span> is proven by providing the following evidence:<\/span><\/b><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \">other certificates which have been issued by a conformity assessment body whose competence is recognised, and which, by means of a clearly defined reference to the relevant specifications or standards, confirm the suitability of the goods:<o_p><\/o_p><\/span><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left: 0.1pt; border: none;\">\n<tbody>\n<tr style=\"height: 17.7pt;\">\n<td width=\"619\" valign=\"top\" style=\"width: 464.35pt; border-width: 1pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-image: initial; padding: 0cm 5.4pt; height: 17.7pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify;\"><span lang=\"EN-US\" style=\" line-height: 115%;  color: #000000;\">\u2022 IEC standards:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" line-height: 115%; \">Phase conductors: <\/span><span lang=\"EN-US\" style=\" line-height: 115%; \">IEC 60888, IEC 60889 and IEC 61089<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNoSpacing\" style=\"text-align: justify; line-height: 110%;\"><span lang=\"EN-US\" style=\" color: #000000;\">Insulators: IEC 60305, IEC 60120, IEC 60372, IEC 60383.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" line-height: 115%; \">Suspension and coupling equipment: IEC 61284.<\/span><span lang=\"sr\" style=\" line-height: 115%; \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> Statements of intent and subject matter of the subcontracting, with a list of subcontractors or sub-suppliers including their full details (name, address, percentage share and the like).<b><span style=\"text-decoration: underline;\"><o_p><\/o_p><\/span><\/b><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span style=\"text-decoration: underline;\"><span lang=\"EN-US\" style=\" \"><o_p><span>&nbsp;<\/span><\/o_p><\/span><\/span><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \">8. Validity of the offer<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The validity period of the tender is 90 days from the date of the public opening of tenders.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><a name=\"SADRZAJ_127\" style=\"color: #000000;\"><\/a><b><span lang=\"EN-US\" style=\" \">IX Offer Guarantee<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> to<b><o_p><\/o_p><\/b><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 4.8pt 0cm 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\">The bidder is obliged to provide an unconditional, callable guarantee for the tender in the amount of 5% of the estimated value of the public procurement, as a guarantee of their commitment to the tender during the validity period of the tender and for 5 days after its expiry.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">X\u00a0 Date and place of execution<\/span><\/b><b><span lang=\"sr\" style=\" \">termination of the contract<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\">a) The contract completion period is 90 calendar days from the date of commissioning.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">b) The place of performance of the contract is <\/span><span lang=\"EN-US\" style=\" \">220 kV Budva-Podgorica 2 (section from pole 34 to Budva TS)<\/span><span lang=\"PL\" style=\" \">.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">XI Language of the offer:<\/span><\/b><b><span lang=\"HR\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"HR\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> the Montenegrin language and the other language which is in official use in Montenegro, in accordance with the Constitution and the law<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> English for the parts of the offer relating to:<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin-left: 67.2pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">\u00a8<\/span><span lang=\"sr\" style=\" \"> technical documentation (certificates proving compliance with the required standards) <o_p><\/o_p><\/span><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" line-height: 115%; \">12. Criteria for the selection of the most favourable offer:<i><o_p><\/o_p><\/i><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"PL\" style=\" \">most beautiful<\/span><span lang=\"HR\" style=\" \">\u017e<\/span><span lang=\"PL\" style=\" \">and offer<\/span><span lang=\"HR\" style=\" \">\u0111<\/span><span lang=\"PL\" style=\" \">The price is for one person.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><span lang=\"EN-US\" style=\" \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; number of points&nbsp; <span style=\"border: 1pt solid windowtext; padding: 0cm;\">&nbsp; &nbsp;&nbsp;100&nbsp;&nbsp;&nbsp; <\/span><\/span><span lang=\"sr-Cyrl\" style=\"  border: 1pt solid windowtext; padding: 0cm;\"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">XIII Time and place for submission of tenders and public opening of tenders<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">Bids are submitted on working days between 8:00 and 14:00, no later than 11:30 on 10 November 2017.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">Offers may be submitted:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">\u2014 by direct delivery to the client's archives at 18 Bulevar Svetog Petra Cetinjskog, Podgorica<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">\u2014 by recommended delivery with a return address at 18 Bulevar Svetog Petra Cetinjskog, Podgorica.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">The public opening of bids, which may be attended by authorised representatives of the bidders with an attached power of attorney signed by an authorised person, will be held on 10 November 2017 at 12:00 noon, at the premises of the Montenegrin Electricity Transmission System at the address <\/span><span lang=\"sr\" style=\" \">18 St. Petar Cetinjski Boulevard, Podgorica.<\/span><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">Article 14 Deadline for making a decision on the selection of the most favourable offer <o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">The decision on the selection of the most favourable offer will be made within 90 days from the date of the public opening of bids.<\/span><b><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"background-image: initial; background-position: initial; background-size: initial; background-repeat: initial; background-attachment: initial; background-origin: initial; background-clip: initial; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" line-height: 115%; \">XV Other data and conditions relevant to the conduct of the public procurement procedure<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">Deadline and method of payment<\/span><\/b><b><span lang=\"sr\" style=\" \">change<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 54pt; text-align: justify; text-indent: -18pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><span lang=\"sr\" style=\" \">-<span style=\"font-variant-numeric: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><!--[endif]--><span lang=\"sr\" style=\" \">The payment deadline is: <o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 70.9pt; text-align: justify; text-indent: -14.2pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><span lang=\"sr\" style=\" \">-<span style=\"font-variant-numeric: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><!--[endif]--><span lang=\"sr\" style=\" \">An advance payment of 20% of the contract value within 7 days of the signing of the contract, the submission of the advance payment guarantee and the advance invoice.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 70.9pt; text-align: justify; text-indent: -14.2pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><span lang=\"sr\" style=\" \">-<span style=\"font-variant-numeric: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><!--[endif]--><span lang=\"sr\" style=\" \">the remaining 30 days after the completion of the work and the submission of the invoice certified by the supervising authority.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 54pt; text-align: justify; text-indent: -18pt; line-height: normal;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><span lang=\"sr\" style=\" \">-<span style=\"font-variant-numeric: normal; font-stretch: normal; font-size: 7pt; line-height: normal; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><!--[endif]--><span lang=\"sr\" style=\" \">The method of payment is by bank transfer, payment into the current account.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><b><span lang=\"EN-US\" style=\" \">Financial Security for Public Procurement Contracts<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><o_p>&nbsp;<\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The bidder whose bid is selected as the most advantageous is obliged to provide the procuring authority with:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 33.6pt; text-align: justify; text-indent: -14.7pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">\u00a8<\/span><span lang=\"sr\" style=\" \"> a guarantee for the advance payment in the amount of the agreed advance, with a validity period 30 days longer than the total duration of the contract.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 33.6pt; text-align: justify; text-indent: -14.7pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">\u00a8<\/span><span lang=\"sr\" style=\" \"> a performance bond in the amount of 5% of the contract value, with a validity period 30 days longer than the total duration of the contract.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"margin: 0cm 0cm 0.0001pt 31.5pt; text-align: justify; text-indent: -12.6pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">\u00a8<\/span><span lang=\"sr\" style=\" \"> A warranty for the rectification of defects during the warranty period, with a validity period 30 days longer than the agreed warranty period.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><b><span lang=\"EN-US\" style=\" \">Data secrecy<\/span><\/b><span lang=\"sr\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p>&nbsp;<\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\" \"><span style=\"color: #000000;\">There is no secret information.<\/span><br clear=\"all\" style=\"break-before: page;\" \/> <\/span><span lang=\"EN-US\" style=\"\"><o_p><\/o_p><\/span><\/p>","protected":false},"featured_media":1465,"template":"","meta":{"_acf_changed":false},"class_list":["post-1591","nabavka","type-nabavka","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Aktivan"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/nabavka\/1591","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/nabavka"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/nabavka"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/1465"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=1591"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}