{"id":1649,"date":"2016-04-01T05:55:38","date_gmt":"2016-04-01T05:55:38","guid":{"rendered":"https:\/\/cges.me\/nabavka\/poziv-za-javno-nadmetanje-u-otvorenom-postupku-javne-nabavke-01-16\/"},"modified":"2016-04-01T05:55:38","modified_gmt":"2016-04-01T05:55:38","slug":"poziv-za-javno-nadmetanje-u-otvorenom-postupku-javne-nabavke-01-16","status":"publish","type":"nabavka","link":"https:\/\/cges.me\/en\/nabavka\/poziv-za-javno-nadmetanje-u-otvorenom-postupku-javne-nabavke-01-16\/","title":{"rendered":"Invitation to tender in open procedure public procurement 01\/16"},"content":{"rendered":"<p><b style=\"color: #000000;  font-size: 11px; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Cabinet for AC and DC distribution<\/span><\/b><span lang=\"IT\" style=\"color: #000000; line-height: normal;  \">includes&nbsp;<\/span><span lang=\"EN-US\" style=\"color: #000000; line-height: normal;  \">Demontage of existing cabinets, installation and connection of new AC and DC cabinets to the existing distribution.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #a6a6a6;\">\n<h1 style=\"border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><a name=\"_Toc447005958\"><\/a>&nbsp;&nbsp;&nbsp;<a name=\"_Toc416180133\"><\/a>&nbsp;&nbsp;&nbsp;<a name=\"_Toc413332214\"><\/a>&nbsp;&nbsp;&nbsp;<span lang=\"EN-US\" style=\"color: black;\">Invitation<\/span><span lang=\"EN-US\" style=\"color: black;\"> For public competition in an open public procurement procedure<\/span><span lang=\"EN-US\" style=\"color: black;\"> No. 01\/16<\/span><span lang=\"PL\" style=\" color: black;\"><o_p><\/o_p><\/span><\/h1>\n<\/div>\n<p class=\"MsoNormal\" align=\"center\" style=\"text-align: center; line-height: normal; margin: 0cm 0cm 0.0001pt 18pt;\"><b><span lang=\"PL\" style=\"  color: black;\">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <o_p><\/o_p><\/span><\/b><\/p>\n<p class=\"MsoNormal\" align=\"center\" style=\"text-align: center; line-height: normal; margin: 0cm 0cm 0.0001pt 18pt;\"><b><span lang=\"PL\" style=\"  color: black;\"><\/span><\/b><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><b><span lang=\"EN-US\" style=\"  color: black;\">Orderer's details<o_p><\/o_p><\/span><\/b><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><b><span lang=\"EN-US\" style=\"  color: black;\"><\/span><\/b><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellpadding=\"0\" width=\"94%\" style=\"width: 94.58%; border: 1pt solid windowtext;\">\n<tbody>\n<tr>\n<td width=\"57%\" style=\"width: 57.24%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Client: <br \/> Crnogorski elektroprenosni sistem AD Podgorica<o_p><\/o_p><\/span><\/p>\n<\/td>\n<td width=\"41%\" style=\"width: 41.74%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Contact person: <br \/> Vladan Raoni\u0107<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"57%\" style=\"width: 57.24%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Address: <br \/> 18 St. Peter of Cetinje Boulevard<o_p><\/o_p><\/span><\/p>\n<\/td>\n<td width=\"41%\" style=\"width: 41.74%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Postcode: <br \/> 81000<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"57%\" style=\"width: 57.24%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">City: <br \/> Podgorica<o_p><\/o_p><\/span><\/p>\n<\/td>\n<td width=\"41%\" style=\"width: 41.74%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Identification number: <br \/> 02751372<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"57%\" style=\"width: 57.24%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Telephone: <br \/> 020 414-753<o_p><\/o_p><\/span><\/p>\n<\/td>\n<td width=\"41%\" style=\"width: 41.74%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Fax: <br \/> 020 246-708<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"57%\" style=\"width: 57.24%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Electronic mail (e-mail): <br \/> vladan.raonic@cges.me<o_p><\/o_p><\/span><\/p>\n<\/td>\n<td width=\"41%\" style=\"width: 41.74%; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0.75pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\" \">Website: <br \/> www.cges.me<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: black;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><b><span lang=\"PL\" style=\"  color: black;\">II Type of procedure<o_p><\/o_p><\/span><\/b><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><b><span lang=\"PL\" style=\"  color: black;\"><\/span><\/b><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: black;\">open <span style=\"color: #000000;\">procedure<\/span><o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000; background: yellow;\"><o_p>&nbsp;<\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">III Subject of the public procurement<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-align: justify; text-indent: -18pt; line-height: normal; margin: 0cm 0cm 0.0001pt 36pt;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><b><span lang=\"sr\" style=\" \">a)<span style=\"font-weight: normal; font-stretch: normal; font-size: 7pt; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><\/b><!--[endif]--><b><span lang=\"sr\" style=\" \">Type of public procurement item<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; line-height: normal; margin: 0cm 0cm 0.0001pt 35.45pt;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"DA\" style=\" \"> Dresses <o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-align: justify; text-indent: -18pt; line-height: normal; margin: 0cm 0cm 0.0001pt 36pt;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><b><span lang=\"sr\" style=\" \">b)<span style=\"font-weight: normal; font-stretch: normal; font-size: 7pt; \">&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><\/b><!--[endif]--><b><span lang=\"sr\" style=\" \">Description of the public procurement item<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" width=\"629\" style=\"width: 471.4pt; margin-left: -5.3pt; border: none;\">\n<tbody>\n<tr>\n<td width=\"629\" valign=\"top\" style=\"width: 471.4pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0cm 5.4pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">Cabinet for AC and DC distribution<\/span><\/b><span lang=\"IT\" style=\" \">includes <\/span><span lang=\"EN-US\" style=\" \">Demontage of existing cabinets, installation and connection of new AC and DC cabinets to the existing distribution.<\/span><span lang=\"IT\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" align=\"center\" style=\"margin-bottom: 0.0001pt; text-align: center; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-align: justify; text-indent: -18pt; line-height: normal; margin: 0cm 0cm 0.0001pt 36pt;\"><span style=\"color: #000000;\"><!-- [if !supportLists]--><b><span lang=\"sr\" style=\" \">c)<span style=\"font-weight: normal; font-stretch: normal; font-size: 7pt; \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><\/span><\/b><!--[endif]--><b><span lang=\"sr\" style=\" \">CPV \u2013 Common Procurement Vocabulary<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left: -5.3pt; border: none;\">\n<tbody>\n<tr>\n<td width=\"612\" valign=\"top\" style=\"width: 458.95pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0cm 5.4pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">31214500-4 Electrical distribution boards<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">IV Conclusion of the framework agreement<\/span><\/b><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">A framework agreement will be concluded: <\/span><span lang=\"DA\" style=\" \">&nbsp;no<\/span><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">V Method of determining the object and <\/span><\/b><b><span lang=\"PL\" style=\" \">Estimated value of the public procurement<\/span><\/b><b><span lang=\"EN-US\" style=\" \">:<\/span><\/b><b><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> <\/span><b><span lang=\"PL\" style=\" \">Estimated value of the procurement without<\/span><\/b><span lang=\"PL\" style=\" \"> <b>Concluding the framework agreement<o_p><\/o_p><\/b><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">The subject of the public procurement is procured as a whole.<\/span><span lang=\"PL\" style=\" \"> Estimated value including VAT: \u20ac30,000.00.<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">I can<\/span><\/b><b><span lang=\"HR\" style=\" \">\u0107<\/span><\/b><b><span lang=\"EN-US\" style=\" \">Submission of alternative bids<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"HR\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"PL\" style=\" \"> no<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><i><span lang=\"PL\" style=\" \"><\/span><\/i><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><i><span lang=\"PL\" style=\" \"><\/span><\/i><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \">VII Conditions for participation in the public procurement procedure<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \"><\/span><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"SL\" style=\" \">a) Mandatory requirements<span style=\"text-decoration: underline;\"> <o_p><\/o_p><\/span><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><i><span style=\"text-decoration: underline;\"><span lang=\"SL\" style=\" \"><\/span><\/span><\/i><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">U<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">procedure<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">public<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">procurement<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">of<\/span><span lang=\"sr\" style=\" \">\u017e<\/span><span lang=\"EN-US\" style=\" \">e<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">to<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">u<\/span><span lang=\"sr\" style=\" \">\u010d<\/span><span lang=\"EN-US\" style=\" \">exists<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">only<\/span><span lang=\"EN-US\" style=\" \"> <\/span><span lang=\"EN-US\" style=\" \">ponu<\/span><span lang=\"sr\" style=\" \">\u0111<\/span><span lang=\"EN-US\" style=\" \">a<\/span><span lang=\"sr\" style=\" \">\u010d <\/span><span lang=\"EN-US\" style=\" \">which<\/span><span lang=\"sr\" style=\" \">:<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">1) is entered in the register with the authority competent for the registration of business entities;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">2) has duly fulfilled all its tax and social security contributions obligations in accordance with the law, or the regulations of the state in which it is established;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">3) prove that he or his legal representative has not been convicted by a final judgment for any of the criminal offences of organised crime involving corruption, money laundering and fraud;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">4) has a permit, licence, approval or other authorisation to carry out the activity that is the subject of the public procurement, if this is required by a special law.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The conditions of paragraph 1 of this point do not apply to natural persons: artists, scientists and cultural creators.<o_p><\/o_p><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt 1pt 3pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm;\"><span style=\"color: #000000;\"><b><span lang=\"SL\" style=\" \">Proof of compliance with mandatory requirements<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"SL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"SL\" style=\"  color: #000000;\">Compliance with the mandatory requirements is demonstrated by providing:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"SL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -15.3pt; line-height: normal; margin: 0cm 0cm 0.0001pt 37.8pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">1) proof of registration with the competent authority for the registration of business entities, with details of the bidder's authorised representatives;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -15.3pt; line-height: normal; margin: 0cm 0cm 0.0001pt 37.8pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">2) a certificate issued by the tax authority confirming that all tax and contribution obligations have been duly declared, calculated and paid up to 90 days prior to the date of the public tender opening, in accordance with the regulations of Montenegro, or the regulations of the country in which the tenderer is headquartered;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -15.3pt; line-height: normal; margin: 0cm 0cm 0.0001pt 37.8pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">3) a certificate from the competent authority issued on the basis of the criminal record, which must not be older than six months as of the date of the public opening of bids;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -15.3pt; line-height: normal; margin: 0cm 0cm 0.0001pt 37.8pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\">4) proof of possession of a valid permit, licence, approval, or other act issued by the competent authority, namely:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<table class=\"MsoNormalTable\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" style=\"margin-left: -5.3pt; border: none;\">\n<tbody>\n<tr style=\"height: 35pt;\">\n<td width=\"619\" valign=\"top\" style=\"width: 464.35pt; border-right-style: solid; border-bottom-style: solid; border-left-style: solid; border-color: windowtext; border-width: 1pt; padding: 0cm 5.4pt; height: 35pt;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\">The following may apply as bidders in this public procurement procedure: a company, a legal entity, or an entrepreneur who holds licences for:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\">-Installation of high-voltage electrical wiring<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\">A company, a legal entity, or a sole trader must have an engineer on their staff who holds a licence for: <o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\">Management of high-current electrical installations<o_p><\/o_p><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p class=\"MsoNormal\" style=\"text-indent: -12pt; line-height: normal; margin: 0cm 0cm 0.0001pt 34.5pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">b) Optional conditions<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"text-align: justify; text-indent: -6.75pt; line-height: normal; margin: 0cm 0cm 0.0001pt 29.25pt;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span style=\"text-decoration: underline;\"><span lang=\"SL\" style=\" \">Professional and technical competence and staffing capacity<\/span><\/span><\/b><b><span lang=\"SL\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">Proof of meeting the professional, technical and personnel qualifications in the public procurement procedure for goods is provided by submitting:<\/span><\/b><b><span lang=\"SL\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">a list of the main deliveries carried out in the last two years, with values, dates and recipients, together with certificates of deliveries issued by the buyer or, if the certificates cannot be provided, for reasons not attributable to the bidder, only a declaration by the bidder regarding the deliveries made, stating the reasons why they are unable to provide the certificates;<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">\u2014statements of intent and subject matter of subcontracting, with a list of subcontractors, or sub-contractors, with detailed information (name, address, percentage share, etc.).<b><span style=\"text-decoration: underline;\"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">As the subject of the procurement includes the services of dismantling existing and installing new cabinets, proof of the necessary professional, technical and personnel qualifications in this public procurement procedure is also provided by submitting:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; text-indent: 21.3pt; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">statements <\/span><span lang=\"EN-US\" style=\" \">on the educational and professional qualifications of the provider, and in particular the qualifications of the persons responsible for providing the specific services;<\/span><span lang=\"EN-US\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span style=\"text-decoration: underline;\"><span lang=\"EN-US\" style=\" \"><\/span><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><i><span lang=\"sr\" style=\" \"><\/span><\/i><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \">8. Validity of the offer<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The validity period of the tender is 90 days from the date of the public opening of tenders.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><a name=\"SADRZAJ_127\" style=\"color: #000000;\"><\/a>&nbsp;&nbsp;&nbsp;<b><span lang=\"PL\" style=\" \">IX Offer Guarantee<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-align: justify; line-height: normal; margin: 4.8pt 0cm 0.0001pt;\"><span lang=\"sr\" style=\"  color: #000000;\">The bidder is obliged to provide an unconditional, first-demand tender guarantee in the amount of 2% of the estimated value of the public procurement, as a guarantee of their commitment to the tender during the validity period of the tender and for 5 days after its expiry.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \">X\u00a0 Date and place of execution<\/span><\/b><b><span lang=\"sr\" style=\" \">termination of the contract<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"sr\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">a) The contract execution deadline in <\/span><span lang=\"EN-US\">TS<\/span><span lang=\"sr\"> 110\/10<\/span><span lang=\"EN-US\">kilo-volt<\/span><span lang=\"EN-US\"> <\/span><span lang=\"EN-US\">Podgorica<\/span><span lang=\"sr\"> 3 <\/span><span lang=\"sr\" style=\" \">is 30 days from the date of conclusion of the contract. The deadline for the performance of the contract in <\/span><span lang=\"EN-US\">TS<\/span><span lang=\"sr\"> 110\/10<\/span><span lang=\"EN-US\">kilo-volt<\/span><span lang=\"EN-US\"> <\/span><span lang=\"EN-US\">Podgorica<\/span><span lang=\"sr\"> 4 <\/span><span lang=\"sr\" style=\" \">It is 30 days from the date of the contract.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">b) The place of performance is Podgorica<\/span><span lang=\"EN-US\">.<\/span><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">XI Language of the offer:<\/span><\/b><b><span lang=\"HR\" style=\" \"><o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"HR\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"PL\" style=\" \"> The Montenegrin language and the other language which is in official use in Montenegro, in accordance with the Constitution and the law.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" line-height: 115%; \">12. Criteria for the selection of the most favourable offer:<i><o_p><\/o_p><\/i><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">most beautiful<\/span><span lang=\"HR\" style=\" \">\u017e<\/span><span lang=\"PL\" style=\" \">and offer<\/span><span lang=\"HR\" style=\" \">\u0111<\/span><span lang=\"PL\" style=\" \">The price is for one person.&nbsp; &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/span><span lang=\"EN-US\" style=\" \">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; number of points&nbsp; <span style=\"border: 1pt solid windowtext; padding: 0cm;\">&nbsp; &nbsp;&nbsp;100&nbsp;&nbsp;&nbsp; <\/span><\/span><span lang=\"sr-Cyrl\" style=\"  border: 1pt solid windowtext; padding: 0cm;\"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">XIII Time and place for submission of tenders and public opening of tenders<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">Offers are submitted on weekdays from <\/span><span lang=\"IT\" style=\" \">8 <\/span><span lang=\"PL\" style=\" \">until 2 p.m., including the day <\/span><span lang=\"IT\" style=\" \">20 April 2016<\/span><span lang=\"IT\" style=\" \"> <\/span><span lang=\"PL\" style=\" \">until 11:30 a.m.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">Offers may be submitted:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">-by direct delivery to the client's archives at 18 Bulevar Svetog Petra Cetinjskog, Podgorica <o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">-by recommended delivery with a return address at 18 Bulevar Svetog Petra Cetinjskog, Podgorica <o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"PL\" style=\" \">The public opening of tenders, which may be attended by authorised representatives of the tenderers with an attached power of attorney signed by an authorised person, will be held on <\/span><span lang=\"IT\" style=\" \">20.04.2016<\/span><span lang=\"PL\" style=\" \">at 12:00 noon at the premises of the Montenegrin Transmission System AD Podgorica at 18 Bulevar Svetog Petra Cetinjskog, Podgorica.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-GB\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-GB\" style=\" \">The Client has set a 22-day period for the submission of bids because, due to the ageing of the equipment in the AC and DC distribution, there has recently been a frequent occurrence of disturbances in the said distribution systems, which cause less reliable operation of the secondary equipment, resulting in&nbsp; jeopardising the orderly power supply to consumers fed from the 110\/10kV Podgorica 3 TS <\/span><span lang=\"EN-US\" style=\" \">and TS 110\/10kV Podgorica 4, a <\/span><span lang=\"EN-GB\" style=\" \">which represents a significant portion of the consumption of the city of Podgorica. In order to prevent potential problems and the inability to supply consumers with a proper supply, the replacement of the AC and DC distribution cabinets is being urgently undertaken.<\/span><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\"><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal; border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \">Article 14 Deadline for making a decision on the selection of the most favourable offer <o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"PL\" style=\"  color: #000000;\">The decision on the selection of the most favourable offer will be made within 90 days from the date of the public opening of bids.<b><o_p><\/o_p><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"PL\" style=\" \"><\/span><\/b><\/span><\/p>\n<div style=\"border: 1pt solid windowtext; padding: 1pt 4pt; background: #d9d9d9;\">\n<p class=\"MsoNormal\" style=\"border: none; padding: 0cm; background-image: initial; background-attachment: initial; background-size: initial; background-origin: initial; background-clip: initial; background-position: initial; background-repeat: initial;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" line-height: 115%; \">XV Other data and conditions relevant to the conduct of the public procurement procedure<o_p><\/o_p><\/span><\/b><\/span><\/p>\n<\/div>\n<p class=\"MsoListParagraph\" style=\"text-align: justify; line-height: normal; margin: 0cm 0cm 0.0001pt 36pt;\"><span lang=\"sr\" style=\"  color: #000000;\">Payment terms are: 30 days upon completion of the quantitative and qualitative acceptance of the equipment.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-align: justify; line-height: normal; margin: 0cm 0cm 0.0001pt 36pt;\"><span lang=\"sr\" style=\"  color: #000000;\">The method of payment is by bank transfer, to the Supplier's account.<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">Guarantee period: minimum 12 months from <\/span><span lang=\"PL\" style=\" \">from the date of completion of the work<\/span><span lang=\"EN-US\" style=\" \">. <o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">Execution of works: in phases.<\/span><span lang=\"PL\" style=\" \"><o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \"> <b>Data confidentiality: <\/b>No.<o_p><\/o_p><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"sr\" style=\"  color: #000000;\"><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><span lang=\"EN-US\" style=\" \">\u00a8<\/span><span lang=\"EN-US\" style=\" \">&nbsp; <b>Financial Security for Public Procurement Contracts<o_p><\/o_p><\/b><\/span><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span style=\"color: #000000;\"><b><span lang=\"EN-US\" style=\" \"><\/span><\/b><\/span><\/p>\n<p class=\"MsoNormal\" style=\"margin-bottom: 0.0001pt; text-align: justify; line-height: normal;\"><span lang=\"EN-US\" style=\"  color: #000000;\">The bidder whose bid is selected as the most advantageous is obliged to provide the procuring authority with:<o_p><\/o_p><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-indent: -12.6pt; line-height: normal; margin: 0cm 0cm 0.0001pt 31.5pt;\"><span style=\"color: #000000;\"><span lang=\"sr\" style=\" \">\u00a8<\/span><span lang=\"sr\" style=\" \"> a performance bond in the amount of 5% of the contract value<\/span><span lang=\"sr\" style=\" \"> without the right of objection, which comes into force on the day of its issue and <\/span><span lang=\"IT\" style=\" \">by which it unconditionally and irrevocably guarantees the full and conscientious performance of its contractual obligations<\/span><\/span><span lang=\"sr\" style=\" \"><span style=\"color: #000000;\">, with a validity period 30 (thirty) days longer than the agreed period<\/span><o_p><\/o_p><\/span><\/p>\n<p class=\"MsoListParagraph\" style=\"text-indent: -12.6pt; line-height: normal; margin: 0cm 0cm 0.0001pt 31.5pt;\"><span lang=\"sr\" style=\" \"><\/span><\/p>\n<p>&nbsp;<\/p>\n<p class=\"MsoListParagraph\" style=\"text-indent: -12.6pt; line-height: normal; margin: 0cm 0cm 0.0001pt 31.5pt;\"><span lang=\"sr\" style=\" \"><\/span><\/p>","protected":false},"featured_media":1465,"template":"","meta":{"_acf_changed":false},"class_list":["post-1649","nabavka","type-nabavka","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Aktivan"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/nabavka\/1649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/nabavka"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/nabavka"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/1465"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=1649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}