{"id":1255,"date":"2025-12-23T10:30:44","date_gmt":"2025-12-23T10:30:44","guid":{"rendered":"https:\/\/cges.me\/?post_type=projekt&#038;p=1255"},"modified":"2026-04-01T09:14:57","modified_gmt":"2026-04-01T09:14:57","slug":"zavrseni-radovi-na-rekonstrukciji-i-prosirenju-ts-220-110-35-kv-mojkovac","status":"publish","type":"projekt","link":"https:\/\/cges.me\/en\/projekt\/zavrseni-radovi-na-rekonstrukciji-i-prosirenju-ts-220-110-35-kv-mojkovac\/","title":{"rendered":"RECONSTRUCTION AND EXTENSION WORKS ON SS 220\/110\/35 KV MOJKOVAC COMPLETED"},"content":{"rendered":"<p>Project: Reconstruction-extension of SS Mojkovac included:<\/p>\n\n\n\n<p>1. Reconstruction of SS Mojkovac- forming basbar system and equipping two line bays, one transformer bay, two metering bays and one section bay 220kV;<br>2. Construction of connecting overhead line 220 kV (in the length of about 2.5 km);<br>3. Construction of transposition of 110 kV of overhead line B.Polje-Mojkovac and Kola\u0161in-Mojkovac; and<br>4. Installation of 110\/35 kV transformer, 20 MVA.<\/p>\n\n\n\n<div class=\"wp-block-group is-nowrap is-layout-flex wp-container-core-group-is-layout-ad2f72ca wp-block-group-is-layout-flex\">\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-2.jpg\" alt=\"\" class=\"wp-image-1256\" title=\"\" srcset=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-2.jpg 1024w, https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-2-16x12.jpg 16w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n\n<p>Works on the reconstruction of SS Mojkovac, construction of connecting overhead line 220 kV and construction of transposition of 110 kV overhead line B.Polje-Mojkovac and Kola\u0161in-Mojkovac were completed in 2014.<br><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"2560\" height=\"1440\" src=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-3-scaled.jpg\" alt=\"\" class=\"wp-image-1257\" title=\"\" srcset=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-3-scaled.jpg 2560w, https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-3-1536x864.jpg 1536w, https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-3-2048x1152.jpg 2048w, https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-3-18x10.jpg 18w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\"><br><br>Completion of the project, i.e. installation of an additional transformer 110\/35 kV in SS 220\/110\/35 kV has allowed Mojkovac to have a significantly higher power supply security of consumers (fulfillment of n-1 security criterion) of distribution consumer area of the municipalities of Kola\u0161in and Mojkovac.\u00a0\u00a0<br>Within the implementation of the subproject \u201cInstallation of 110\/35 kV transformer\u201d, transformer was purchased, building permit was obtained and after revision of the main design in the period August-December 2015 were completed construction and electrical and installation works on the installation of a new transformer 110\/35 kV, 20 MVA. Besides, the reconstruction of auxiliary power supply was completed.<br><br>Project benefits are:<br>- upgraded capacity in transformation;<br>- higher reliability and security of power supply;<br>-   better quality of delivered electricity;<br>- reduced duration of no-load state.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-4.jpg\" alt=\"\" class=\"wp-image-1258\" title=\"\" srcset=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-4.jpg 1024w, https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/RADOVI-NA-REKONSTRUKCIJI-I-PROSIRENJU-TS-220-110-35-KV-MOJKOVAC-slika-4-16x12.jpg 16w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The total project value is about 3 million euro.\nDemanding project was completed as planned during 2016.<br>After obtaining use permit the project is fully implemented.<\/p>","protected":false},"featured_media":1259,"parent":0,"menu_order":19,"template":"","meta":{"_acf_changed":false},"class_list":["post-1255","projekt","type-projekt","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Zavr\u0161en"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti\/1255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/1259"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=1255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}