{"id":1288,"date":"2025-12-23T12:50:03","date_gmt":"2025-12-23T12:50:03","guid":{"rendered":"https:\/\/cges.me\/?post_type=projekt&#038;p=1288"},"modified":"2025-12-23T14:13:39","modified_gmt":"2025-12-23T14:13:39","slug":"projekat-mpls","status":"publish","type":"projekt","link":"https:\/\/cges.me\/en\/projekt\/projekat-mpls\/","title":{"rendered":"MPLS Project"},"content":{"rendered":"<p>In December 2023, CGES launched a new telecommunications system based on IP\/MPLS technology and CISCO equipment. The investment is worth \u20ac1,300,000.00 excluding VAT, and the supplier is the Telegroup-\u010cikom-Roaming consortium.<\/p>\n\n\n\n<p>CGES has its own passive optical network and, in combination with new IP\/MPLS active equipment, it has a modern and reliable telecommunication system that connects all facilities of interest to CGES. The new telecommunication system of CGES should replace the existing SDH\/PDH system and will enable an additional level of reliability and availability during the transmission of services necessary for the normal operation of the electricity transmission system, such as: SCADA systems, metering systems, operational telephony, protection systems, video surveillance, business network, exchange of information with Elektroprivreda Crne Gore and CEDIS, international connections with neighbouring transmission system operators and many others. To this end, redundancies have been implemented in the multi-level system. Several redundant telecommunication connections lead to each location, both by optical cables and by radio relay links. In addition, redundancies have been implemented at the level of power sources, modular power supply, processor and traffic cards, up to the level of communication interfaces.<\/p>\n\n\n\n<p>The information and communication network built in this way represents a safe way of data transmission and connection for both non-critical and critical systems. In addition to the transmission speed of 10 Gbit\/s, with the possibility of upgrading to 100 Gbit\/s, it is important to note the main functionality of the system, which is the provision of simultaneous transmission of different types of data from different systems through a unique information and communication network, where the services are completely logically separated, which is a very important characteristic from the aspect of information security. In this way, the maximum priority and security of critical over non-critical systems is ensured, that is, the protection of information of one system in relation to another is carried out.<\/p>\n\n\n\n<p>Control, monitoring and configuration of the IP\/MPLS network is done centrally from the National Dispatch Centre in Podgorica through a special system for central control. The system has a graphical user interface (GUI), which enables CGES staff, in addition to configuration and management, to monitor the state of the network and individual services in real time.<\/p>\n\n\n\n<p>It is important to note that the new TC system is the is the result of the dedicated work of the staff of the CGES Telecommunications Department, who participated in the implementation of the project from design, implementation to commissioning of the entire system. The new IP\/MPLS telecommunication system will fully meet the needs of CGES, and potentially enables the connection of all institutions and entities of state importance throughout the territory of Montenegro.<\/p>\n\n\n\n<p>With this project, CGES has shown that it is keeping up with the times not only in energy, but also in ICT solutions, because the control of large industrial systems, such as the electric power system of Montenegro, cannot be imagined without such a telecommunication system.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"940\" height=\"1343\" src=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/MPLS_sema.jpg\" alt=\"\" class=\"wp-image-1289\" title=\"\" srcset=\"https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/MPLS_sema.jpg 940w, https:\/\/cges.me\/wp-content\/uploads\/2025\/12\/MPLS_sema-8x12.jpg 8w\" sizes=\"(max-width: 940px) 100vw, 940px\" \/><\/figure>","protected":false},"featured_media":1289,"parent":0,"menu_order":18,"template":"","meta":{"_acf_changed":false},"class_list":["post-1288","projekt","type-projekt","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Aktivan"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti\/1288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/1289"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=1288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}