{"id":1296,"date":"2025-12-23T13:09:41","date_gmt":"2025-12-23T13:09:41","guid":{"rendered":"https:\/\/cges.me\/?post_type=projekt&#038;p=1296"},"modified":"2026-02-01T05:10:13","modified_gmt":"2026-02-01T05:10:13","slug":"rekonstrukcija-i-prosirenje-ts-110-35-kv-pljevlja-1-5","status":"publish","type":"projekt","link":"https:\/\/cges.me\/en\/projekt\/rekonstrukcija-i-prosirenje-ts-110-35-kv-pljevlja-1-5\/","title":{"rendered":"Reconstruction and expansion of the 110\/35 kV substation \u201cPljevlja 1\u201d"},"content":{"rendered":"<p>The 110\/35 kV substation \u201cPljevlja 1\u201d has been in operation since 1961. Its reconstruction and equipment replacement will increase the reliability of power supply and enable remote control. The project implementation will reduce maintenance costs, and with the introduction of the 110 kV transmission line \u201c\u017dabljak \u2013 Pljevlja,\u201d the security of power supply to the distribution consumers in the municipalities of Pljevlja and \u017dabljak will be enhanced.<\/p>\n\n\n\n<p>This project includes reconstruction and expansion works on the 110\/35 kV substation \u201cPljevlja 1\u201d in the following scope:<\/p>\n\n\n\n<p>&nbsp;The part of the project related to the reconstruction of the existing 110 kV facility includes works on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Kompletna zamjena temelja i nosa\u010da visokonaponske opreme<\/li>\n\n\n\n<li>Djelimi\u010dna zamjena ulaznih portala<\/li>\n\n\n\n<li>Kompletna zamjena sabirni\u010dkih portala<\/li>\n\n\n\n<li>Rekonstrukcija saobra\u0107ajne infrastrukture, kablovske infrastrukture, ograde i rasvjete<\/li>\n<\/ul>\n\n\n\n<p>&nbsp;The part of the project related to the substation expansion includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u00a0Izgradnju i kompletno opremanje jednog dalekovodnog polja, spojnog polja, dva mjerna i dva rezervna polja i<\/li>\n\n\n\n<li>Izgradnju saobra\u0107ajne infrastrukture, kablovske infrastrukture, ograde i rasvjete.<\/li>\n<\/ul>\n\n\n\n<p>The preparation and revision of the main project have been completed, the building permit has been obtained, and the contractor has been selected. On February 25, 2023, the contractor was introduced to the site. The works are being carried out according to the planned schedule, and the electromechanical works have been completed, while less than 5% of construction works remain.<\/p>\n\n\n\n<p>For the second phase of this project (foundations and transformer tanks with oil containment), the contractor has been selected.<\/p>\n\n\n\n<p>The value of the investment is \u20ac3 million, and the planned completion date is 2024.<\/p>\n\n\n\n<p><\/p>","protected":false},"featured_media":94,"parent":0,"menu_order":10,"template":"","meta":{"_acf_changed":false},"class_list":["post-1296","projekt","type-projekt","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Aktivan"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti\/1296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/94"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=1296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}