{"id":90,"date":"2025-11-20T15:45:33","date_gmt":"2025-11-20T15:45:33","guid":{"rendered":"https:\/\/cges.me\/projekt\/ts-110-35-kv-zabljak-4\/"},"modified":"2025-12-23T12:54:58","modified_gmt":"2025-12-23T12:54:58","slug":"ts-110-35-kv-zabljak-4","status":"publish","type":"projekt","link":"https:\/\/cges.me\/en\/projekt\/ts-110-35-kv-zabljak-4\/","title":{"rendered":"SS 110\/35 kV \u017dabljak"},"content":{"rendered":"<p>The construction of SS 110\/35 kV \u017dabljak is a project that is being implemented to connect \u017dabljak to the transmission network via the already built OHL 110 kV Pljevlja - \u017dabljak and to provide conditions for the connection of the future OHL 110 kV Brezna - \u017dabljak.<\/p>\n\n\n\n<p>Until 2023, the area of \u017dabljak and \u0160avnik was fed radially via the 35 kV overhead line Pljevlja - \u017dabljak, which was constructed as a 110 kV overhead line with a wire having a cross-section of 150\/25 mm2. To power \u017dabljak, there is also a backup power supply direction from Nik\u0161i\u0107 via the long 35 kV overhead lines Nik\u0161i\u0107 - Brezna - \u0160avnik - \u017dabljak. Due to the dynamic development of that area as a winter tourist centre, it was necessary to increase the capacity in the transformation and provide a more secure and reliable power supply to \u017dabljak by constructing SS 110\/35 kV and connecting it to SS Pljevlja via the mentioned overhead line, which operated at 35 kV voltage level.<\/p>\n\n\n\n<p>The benefits of project implementation are:<\/p>\n\n\n\n<p>\u2013 Improvement of voltage - reactive conditions;<\/p>\n\n\n\n<p>\u2013 Loss reduction;<\/p>\n\n\n\n<p>\u2013 Increase of system reliability and;<\/p>\n\n\n\n<p>\u2013 Reduction of unserved energy levels.<\/p>\n\n\n\n<p>An agreement on the connection of the facility was concluded with CEDIS, and the facility was connected to Montenegro's electric power system on 28 December 2023. In the meantime, the remaining construction works have almost been completed (less than 5% of construction works remain, which are expected to be completed by 31 August 2024), after which the technical inspection of the performed works and the further procedure for obtaining a permit for the permanent operation of the facility in question will continue.<\/p>\n\n\n\n<p>The investment value is 4.8 million euros, and the planned completion date is 2024.<\/p>\n\n\n\n<p><\/p>","protected":false},"featured_media":65,"parent":0,"menu_order":14,"template":"","meta":{"_acf_changed":true},"class_list":["post-90","projekt","type-projekt","status-publish","has-post-thumbnail","hentry"],"acf":{"status":"Aktivan"},"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti\/90","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/projekti"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/projekt"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/65"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=90"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}