{"id":6627,"date":"2020-09-28T11:27:48","date_gmt":"2020-09-28T11:27:48","guid":{"rendered":"https:\/\/cges.me\/vijest-i-dogadjaj\/elektroenergetski-pokazatelji-za-avgust-2020-2\/"},"modified":"2026-01-22T01:12:45","modified_gmt":"2026-01-22T01:12:45","slug":"elektroenergetski-pokazatelji-za-avgust-2020","status":"publish","type":"vijest-i-dogadjaj","link":"https:\/\/cges.me\/en\/vijest-i-dogadjaj\/elektroenergetski-pokazatelji-za-avgust-2020\/","title":{"rendered":"Electricity supply indicators for August 2020"},"content":{"rendered":"<p><\/p>\n\n\n\n<p><span>During August 2020, the network<\/span><span>a<\/span><span> <\/span><span>Montenegrin<\/span><span> <\/span><span>electrical transmission<\/span><span> <\/span><span>system<\/span><span> <span>(CGES) reported a total of <b>711, 347 GWh<\/b> electricity, which is for <b>23, 43% more<\/b> compared to the same month of the previous year. Of this, 52.99 GWh was supplied to direct consumers (KAP, To\u0161\u010delik and Railway Infrastructure), 208.797 GWh to distribution consumers, while 449.565 GWh was supplied to other electricity systems.<\/span><\/span><\/p>\n\n\n\n<p><span>When it comes to electricity generation in Montenegro, 1,000 MW was injected into the transmission system from generation facilities in August this year. <b>234, 545 GWh<\/b> electricity, of which is <b>25%<\/b> produced in hydroelectric power stations, <b>9% <\/b>was obtained from wind, and the rest was produced in a thermal power station.<o_p><\/o_p><\/span><\/p>\n\n\n\n<p><span>In August, the CGES maintenance service, in addition to routine maintenance, carried out 3 equipment audits and 5 overhauls in substations, as well as 13 interventions. Regarding transmission lines, 5 inspections and 6 emergency interventions were carried out in August.<\/span><span> <\/span><span>The aforementioned activities are carried out with our own resources, thanks to our skilled and qualified staff, as well as the modern equipment our company possesses. <o_p><\/o_p><\/span><\/p>\n\n\n\n<p><span>Crnogorski elektroprenosni sistem AD is a company with its registered office in Podgorica, which operates in the public interest in Montenegro.<span> <\/span>Electricity transmission. The CGES transmission system consists of 1,411 km of transmission lines and 25 substations at 400 kV, 220 kV and 110 kV voltage levels, with a total installed capacity of 3,866 MVA, while operational management is carried out from the organisational National Dispatch Centre, using state-of-the-art software tools.<o_p><\/o_p><\/span><\/p>\n\n\n\n<p><\/p>","protected":false},"featured_media":7094,"template":"","meta":{"_acf_changed":false},"class_list":["post-6627","vijest-i-dogadjaj","type-vijest-i-dogadjaj","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/vijest-i-dogadjaj\/6627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/vijest-i-dogadjaj"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/vijest-i-dogadjaj"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/7094"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=6627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}