{"id":7649,"date":"2020-07-22T07:54:10","date_gmt":"2020-07-22T07:54:10","guid":{"rendered":"https:\/\/cges.me\/vijest-i-dogadjaj\/elektroenergetski-pokazatelji-za-jun-2020\/"},"modified":"2026-06-16T09:13:22","modified_gmt":"2026-06-16T09:13:22","slug":"elektroenergetski-pokazatelji-za-jun-2020","status":"publish","type":"vijest-i-dogadjaj","link":"https:\/\/cges.me\/en\/vijest-i-dogadjaj\/elektroenergetski-pokazatelji-za-jun-2020\/","title":{"rendered":"Electricity supply indicators for June 2020"},"content":{"rendered":"<p><\/p>\n\n\n\n<p><span>In June 2020<\/span><span>CGES<\/span><span> <\/span><span>transmitted<\/span><span> <\/span><span>a<\/span><span> <\/span><span>total<\/span><span> <\/span><span>, a total of <b>611,980 GWh<\/b> of electricity, which is for <b>17.68% more<\/b> han in the same month last year. Of that, 51,76 GWh was delivered to direct consumers, 167,803 GWh to distribution consumers, while 392,417 GWh was delivered to other electricity systems.<\/span><\/p>\n\n\n\n<p><span>When it comes to electricity generation in Montenegro, in June this year <b>155,982 GWh<\/b> of electricity was injected into the transmission system <b>20%<\/b> was generated in hydroelectric power plants, and 13,612 GWh, <b>9% <\/b>was obtained from the wind, and the rest was generated in the thermal power plant.<o_p><\/o_p><\/span><\/p>\n\n\n\n<p><span>During June, in addition to current maintenance, the CGES Maintenance Service performed 4 revisions and 1 overhaul of equipment in substations, as well as 3 interventions. When it comes to overhead lines, 12 revisions and 3 overhauls were performed, as well as 2 emergency interventions.<\/span><span> <\/span><span>The performance of these activities is realized with our own resources, thanks to the professional and quality staff, as well as modern equipment owned by our company. <o_p><\/o_p><\/span><\/p>\n\n\n\n<p><span>Crnogorski elektroprenosni sistem AD (CGES) is joint stock Company based in Podgorica. The core activity of the Company<span> <\/span>is electricity transmission. The electricity transmission system consists of 1411 km of overhead lines and 25 substations at 110 kV, 220 kV and 400 kV voltage level, while the total transformation capacity of the transmission network is 3,866 MVA. In order to ensure smooth system operation 24 hours a day, transmission system monitoring and control is performed from the organizational part National Dispatch Centre, by using state-of-the-art software tools.<\/span><\/p>\n\n\n\n<div class=\"wp-block-group\"><div class=\"wp-block-group__inner-container is-layout-constrained wp-block-group-is-layout-constrained\">\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1500\" height=\"1100\" data-id=\"9902\" src=\"https:\/\/cges.me\/wp-content\/uploads\/2020\/07\/jun-infografik.png\" alt=\"\" class=\"wp-image-9902\" title=\"\" srcset=\"https:\/\/cges.me\/wp-content\/uploads\/2020\/07\/jun-infografik.png 1500w, https:\/\/cges.me\/wp-content\/uploads\/2020\/07\/jun-infografik-16x12.png 16w\" sizes=\"(max-width: 1500px) 100vw, 1500px\" \/><\/figure>\n<\/figure>\n<\/div><\/div>\n\n\n\n<p><\/p>","protected":false},"featured_media":9902,"template":"","meta":{"_acf_changed":false},"class_list":["post-7649","vijest-i-dogadjaj","type-vijest-i-dogadjaj","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/vijest-i-dogadjaj\/7649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/vijest-i-dogadjaj"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/vijest-i-dogadjaj"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/9902"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=7649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}