{"id":9579,"date":"2026-04-20T16:32:16","date_gmt":"2026-04-20T16:32:16","guid":{"rendered":"https:\/\/cges.me\/?post_type=vijest-i-dogadjaj&#038;p=9579"},"modified":"2026-04-22T10:46:07","modified_gmt":"2026-04-22T10:46:07","slug":"energetski-iskorak-sjevera-crne-gore-znanje-sigurnost-i-razvoj","status":"publish","type":"vijest-i-dogadjaj","link":"https:\/\/cges.me\/en\/vijest-i-dogadjaj\/energetski-iskorak-sjevera-crne-gore-znanje-sigurnost-i-razvoj\/","title":{"rendered":"Advancing Energy Development in Northern Montenegro - Knowledge, Security and Development"},"content":{"rendered":"<p><strong>Prime Minister Spaji\u0107 Pays Working Visit to Pljevlja: Enhanced Security of Electricity Supply in Northern Region<\/strong><\/p>\n\n\n\n<p>As part of his visit to northern Montenegro, Prime Minister Milojko Spaji\u0107 toured the recently completed reconstruction works at the 110 kV electrical substation in Pljevlja\u2014one of the oldest facilities of its kind in the country. The Prime Minister was welcomed at the site by a delegation of Crnogorski elektroprenosni sistem-CGES, led by Executive Director Ivan Asanovi\u0107 and Chairman of the Board Aleksandar Miju\u0161kovi\u0107.<\/p>\n\n\n\n<p>On this occasion, Asanovi\u0107 highlighted the importance of the reconstructed \u201cPljevlja 1\u201d substation, an investment worth \u20ac3 million.<\/p>\n\n\n\n<p>\u201cThe reconstruction and extension of the 110\/35 kV substation \u2018Pljevlja 1\u2019, which has been in operation since 1961, represents the backbone of electricity supply in Pljevlja and one of the most demanding and significant infrastructure projects within Montenegro\u2019s power system. This project is a true example of expertise, responsibility, and top-notch engineering. Such results reflect a high level of planning, coordination, and professionalism of our teams. Its implementation has significantly improved system reliability, reduced maintenance costs, and enabled modern remote-control operations. Its importance is further enhanced by integration with the 110 kV transmission line \u2018\u017dabljak\u2013Pljevlja\u2019, which previously operated at 35 kV, thereby strengthening the security of supply across the entire northern region,\u201d said Asanovi\u0107.<\/p>\n\n\n\n<p>He also noted that another strategically important project for tourism development has been successfully completed\u2014the construction of the 110\/35 kV substation in \u017dabljak, the first transmission substation in the municipality, along with the 110 kV transmission line \u201cBrezna\u2013\u017dabljak.\u201d<\/p>\n\n\n\n<p>\u201cFollowing a successful trial operation, the substation has received its operational permit and has now been formally commissioned. The value of this investment is \u20ac5 million, and its significance is multifaceted. The project ensures a more stable and reliable electricity supply, delivering significant benefits for \u017dabljak as one of Montenegro\u2019s key tourist destinations. It enhances the sustainability and efficiency of the tourism sector while creating conditions for further economic growth and new investments,\u201d he added.<\/p>\n\n\n\n<p>The Director of CGES emphasized that these projects send a strong message to the Montenegrin public:<\/p>\n\n\n\n<p>\u201cDomestic expertise and knowledge are capable of delivering even the most complex energy projects with maximum reliability and with no interruptions in supply to consumers. These projects are the foundation for a safer, more developed, and economically stronger north of Montenegro.\u201d<\/p>\n\n\n\n<p>Chairman of the Board of CGES, Aleksandar Miju\u0161kovi\u0107, presented to the Prime Minister a five-year investment plan exceeding \u20ac200 million.<\/p>\n\n\n\n<p>\u201cI would use this opportunity to invite you to be our guest at the opening of the \u2018Lastva\u2013Pljevlja\u2019 transmission line, which will be completed in about a month. This line connects the coast to Italy via a submarine cable and extends all the way to Pljevlja. It is one of the most substantial projects we have implemented contributing to Montenegro becoming a major regional energy hub, attracting increased interest from international investors,\u201d said Miju\u0161kovi\u0107 .<\/p>\n\n\n\n<p>Prime Minister Milojko Spaji\u0107 underlined the importance of the projects implemented by CGES:<\/p>\n\n\n\n<p>\u201cEnergy independence, and in particular the stability of electricity supply is of paramount importance for our country\u2019s further economic development. By continuously investing in energy projects across Montenegro and building strategic partnerships with global energy leaders, we are strengthening the foundations of a secure and prosperous future,\u201d said Spaji\u0107.<\/p>\n\n\n\n<p><\/p>","protected":false},"featured_media":9580,"template":"","meta":{"_acf_changed":true},"class_list":["post-9579","vijest-i-dogadjaj","type-vijest-i-dogadjaj","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/vijest-i-dogadjaj\/9579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/vijest-i-dogadjaj"}],"about":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/types\/vijest-i-dogadjaj"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media\/9580"}],"wp:attachment":[{"href":"https:\/\/cges.me\/en\/wp-json\/wp\/v2\/media?parent=9579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}