Overhead line network
1
Six 400 kV transmission lines (Lastva - Podgorica 2, Lastva - Trebinje, Podgorica 2 - Ribarevine, Ribarevine - Peć, Ribarevine - Pljevlja 2 and Podgorica 2 - Tirana);
1
One 400 kV section, 'Čevo – Brezna,' with a length of 54 km, which is currently operating at 110 kV voltage;
2
Eight 220 kV transmission lines (HPP Perućica - Trebinje, Podgorica 1 - Perućica, Podgorica 1 - Koplik, Podgorica 1 - Mojkovac, Mojkovac - Pljevlja 2, Piva - Pljevlja 264, Piva - Pljevlja 265, Piva – Buk Bijela;
3
Forty - two 110 kV transmission lines, of which three are double circuit lines (2x110 kV) and four are operating at 35kV;
4
Two 110 kV cables (Podgorica 3-Podgorica 5 and 2 Nikšić-Kličevo)
5
One 110 kV cable-overhead line ("Podgorica 1 - Podgorica 4")
Transmission network of the Montenegrin system
(current status)