The third session of the Board of Directors of Montenegro's Electric Transmission System AD was held.
On the third the session of the Board of Directors of the Montenegrin Electricity Transmission System AD, which was heldZhana 23.10.In Podgorica, 2017 The Abbreviated Periodic Report on the Operations of Crnogorski elektroprenosni sistem AD for the period from 1 January 2017 to 30 September 2017 has been adopted, which you can download. here. I