Another symbol of green energy, the 'Solar Power' solar power plant, has received the 'green light' to connect to the transmission system, which will take place in 2027.This was specified in the Agreement on the Construction of Connection Infrastructure and the Connection of the 170 MW solar power plant, which was signed by Ivan Asanović, Executive Director of CGES and co-owner of "Solar Power", Rita Beatrice Gossweiler.
With its respective and very stable network, CGES is fully prepared for the new sources of the future.